2018 International Existing Building Code (IEBC) Loose Leaf
NOW AVAILABLE! ORDER YOUR COPY NOW!
2018 International Existing Building Code® (IEBC®) Loose Leaf
Encourages the use and reuse of existing buildings. This code covers repair, alteration, addition and change of occupancy for existing buildings and historic buildings, while achieving appropriate levels of safety without requiring full compliance with the new construction requirements contained in the other I-Codes. Key changes include:
• Section 410 Accessibility has been relocated to a new Section 305. Chapters 4, 5, 6, 13 and 14 have been relocated resulting in a
reorganization and new chapter numbering.
• Requirements for live loads from Chapters 4 and 8 have been combined and placed in Chapter 3 to apply for all compliance methods.
• Structural components damaged by snow events must be repaired assuming snow loads for new buildings from the IBC.
• A new exception is added for loading of existing structural elements next to an addition in buildings designed using the IRC.
• When a work area includes more than half the building in an alteration, wall anchors must be installed at the roof line along
reinforced concrete and masonry walls.
• Buildings undergoing a change of occupancy shall have live, snow, wind and seismic loads checked. Design loads are based on
IBC-level forces.
• When a change of occupancy occurs placing a building in a higher risk category, the seismic loads on the building must be
evaluated using IBC-level forces. Access to the building must be maintained when passing through or near other buildings and
structures.
• Where storm shelters are required based on IBC and ICC 500 for Group E Occupancies, any addition to such existing
occupancies where the occupant load of the addition is 50 or more will trigger the construction of a storm shelter.
• Carbon Monoxide provisions have been added in the Prescriptive Method Additions, Alterations Level 2 Additions, and in
Additions for I-1, I-2, I-4 and R Occupancies.
• Emergency Escape and Rescue Opening provisions related to being operational have been added to Prescriptive Compliance
Method and Alterations Level 1.
Publisher: ICC/2018/ 3550L18/ 9781609837518
Price | $130.95 |
---|---|
Customer Service | Customer ServiceWe're Here To Help Call us anytime during our customer service hours... Monday through Friday - 8:30 am to 4:30 pm (Pacific) Order Questions: TOLL FREE, 800-273-7375 (Outside the U.S. call 818-887-7828). Our Address: 8001 Canoga Avenue Canoga Park, CA 91304 US Phone: 800-275-2665 E-mail: sales@buildersbook.com |
Description | NOW AVAILABLE! ORDER YOUR COPY NOW! 2018 International Existing Building Code® (IEBC®) Loose Leaf Encourages the use and reuse of existing buildings. This code covers repair, alteration, addition and change of occupancy for existing buildings and historic buildings, while achieving appropriate levels of safety without requiring full compliance with the new construction requirements contained in the other I-Codes. Key changes include: • Section 410 Accessibility has been relocated to a new Section 305. Chapters 4, 5, 6, 13 and 14 have been relocated resulting in a • Requirements for live loads from Chapters 4 and 8 have been combined and placed in Chapter 3 to apply for all compliance methods. • Structural components damaged by snow events must be repaired assuming snow loads for new buildings from the IBC. • A new exception is added for loading of existing structural elements next to an addition in buildings designed using the IRC. • When a work area includes more than half the building in an alteration, wall anchors must be installed at the roof line along • Buildings undergoing a change of occupancy shall have live, snow, wind and seismic loads checked. Design loads are based on • When a change of occupancy occurs placing a building in a higher risk category, the seismic loads on the building must be
• Where storm shelters are required based on IBC and ICC 500 for Group E Occupancies, any addition to such existing • Carbon Monoxide provisions have been added in the Prescriptive Method Additions, Alterations Level 2 Additions, and in • Emergency Escape and Rescue Opening provisions related to being operational have been added to Prescriptive Compliance Publisher: ICC/2018/ 3550L18/ 9781609837518 |