AIA G701/Cma - Change Order, Construction Manager-Adviser Edition (Package of 50) (2 COPIES LEFT)

was $49.99 Special Price $44.99
Availability:
In stock
Product Code
G701-CM

PLEASE NOTE: This is a physical copy of the contract, not a download.

Execution of a completed G701-2000 indicates agreement upon all the terms of the change, including any changes in the Contract Sum (or Guaranteed Maximum Price) and Contract Time. It provides space for the signatures of the owner, contractor, construction manager adviser, and architect, and for a complete description of the change. The major difference between G701CMa and G701 is that the signature of the construction manager adviser, along with those of the owner, architect, and contractor, is required to validate the change order.

50 PER UNIT

AIA Documents are Non-Returnable

AIA Contract Documents and the content therein are copyrighted works owned by American Institute of Architects. AIA Contract Documents are protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction, display or distribution of an AIA Contract Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. AIA Contract Documents are licensed for one time use only and may not be reproduced prior to its completion.

AIA, The American Institute of Architects and the AIA emblem are registered trademarks owned by the American Institute of Architects.

Published/Edition: 2000. ISBN/Book No.: G701/CMa

More Information
Price$49.99
Customer Service

Customer Service

We're Here To Help

Call us anytime during our customer service hours...


Monday through Friday - 8:30 am to 4:30 pm (Pacific)
Saturday - 10am to 4pm (Pacific)

Order Questions:

TOLL FREE, 800-273-7375 (Outside the U.S. call 818-887-7828).

Our Address:


8001 Canoga Avenue
Canoga Park, CA 91304 US
Phone: 800-275-2665
Fax Your Order
818-887-7990
Print Our Fax Order Form

Description

PLEASE NOTE: This is a physical copy of the contract, not a download.

Execution of a completed G701-2000 indicates agreement upon all the terms of the change, including any changes in the Contract Sum (or Guaranteed Maximum Price) and Contract Time. It provides space for the signatures of the owner, contractor, construction manager adviser, and architect, and for a complete description of the change. The major difference between G701CMa and G701 is that the signature of the construction manager adviser, along with those of the owner, architect, and contractor, is required to validate the change order.

50 PER UNIT

AIA Documents are Non-Returnable

AIA Contract Documents and the content therein are copyrighted works owned by American Institute of Architects. AIA Contract Documents are protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction, display or distribution of an AIA Contract Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. AIA Contract Documents are licensed for one time use only and may not be reproduced prior to its completion.

AIA, The American Institute of Architects and the AIA emblem are registered trademarks owned by the American Institute of Architects.

Published/Edition: 2000. ISBN/Book No.: G701/CMa